Search results for "Staged construction"
showing 4 items of 4 documents
Concrete arch bridges built by lattice cantilevers
2013
In this paper a study about concrete arch bridges built by lattice cantilevers is presented. Lattice cantilevers are partial structures composed of deck, arch, piers and provisional steel diagonals, organized as reticular cantilever girders, in order to build arch bridges without the use of centrings, supports or temporary towers. Characteristics of this construction methodology with its variants are explained together with their implications in the erection sequence. Partial elastic scheme method is implemented in order to find initial forces of temporary cables and a forward analysis is carried out to follow the actual sequence of construction, by extending a procedure already applied to …
A Mixed Approach for Determination of Initial Cable Forces in Cable-Stayed Bridges and the Parameters Variability
2015
The determination of initial cable forces in cable-stayed bridges is an important first step in design and analysis of the structure under external loads. Adjustments of stay forces are often required during construction in order to assure the requested behaviour of the bridge in terms of final geometrical configuration and internal force distribution. An accurate assessment of the stay tensioning system allows designers to obtain a good result at the end of construction, by considering the parameters involved as deterministic quantities, assuring the observance of the execution tolerances during works. Actual loads and their variations need instead a stochastic approach which can give usef…
Stressing sequence of steel cable-stayed bridges built by cantilevering
2015
The construction of cable-stayed bridges by cantilevering implies several changes of geometry, stress and strain patterns during the assemblage of segments. The main target to be satisfied in the construction process is the achievement of the required final geometry and of a convenient state of stress for self-weight and sustained loads. The sequence of stay stressing and the values of prestressing forces at each stage of segment assembling have the main role for reaching the desired result of design, due to the large redundancy of cable-stayed structures.Among the different procedures proposed in the literature for initial cable force determination, the Partial Elastic Scheme (PES) Method …
Creep effects and stress adjustments in cable-stayed bridges with concrete deck
2010
In construction stages of cable-stayed bridges with prestressed concrete deck, the influence of creep on stresses and strains is very important in order to foresee the final patterns of internal forces and displacements. In cantilever construction, the concrete deck can be considered, in each stage, as a continuous beam resting on elastic restraints, which modify with successive additions of new segments, until the last one has been assembled. In these stages stress relaxation in concrete occurs as well as vertical displacements increase. Ehen structure has been closed by inserting midspan segment, stress redistribution begins, due to creep. Deformation and internal force development in con…