Concrete arch bridges built by lattice cantilevers

2013

In this paper a study about concrete arch bridges built by lattice cantilevers is presented. Lattice cantilevers are partial structures composed of deck, arch, piers and provisional steel diagonals, organized as reticular cantilever girders, in order to build arch bridges without the use of centrings, supports or temporary towers. Characteristics of this construction methodology with its variants are explained together with their implications in the erection sequence. Partial elastic scheme method is implemented in order to find initial forces of temporary cables and a forward analysis is carried out to follow the actual sequence of construction, by extending a procedure already applied to …

Cable-stayedarchEngineeringCantileverStaged constructionbusiness.industryMechanical EngineeringDiagonalLattice cantileverBuilding and ConstructionStructural engineeringArch bridge; Cable-stayed; Lattice cantilever; Partial elastic scheme; Staged constructionArch bridgeDeckConceptual designMechanics of MaterialsPartial elastic schemeLattice (order)GirderCantilever methodArchbridgebusinesscantileverCivil and Structural Engineering
researchProduct

A Mixed Approach for Determination of Initial Cable Forces in Cable-Stayed Bridges and the Parameters Variability

2015

The determination of initial cable forces in cable-stayed bridges is an important first step in design and analysis of the structure under external loads. Adjustments of stay forces are often required during construction in order to assure the requested behaviour of the bridge in terms of final geometrical configuration and internal force distribution. An accurate assessment of the stay tensioning system allows designers to obtain a good result at the end of construction, by considering the parameters involved as deterministic quantities, assuring the observance of the execution tolerances during works. Actual loads and their variations need instead a stochastic approach which can give usef…

EngineeringParameter variabilitylcsh:TE1-450Bridge (nautical)DeckBridge Cable-stayed Parameter variability Probability Staged construction Staylcsh:TG1-470symbols.namesakelcsh:Bridge engineeringMixed approachGaussian functionBridgelcsh:Highway engineering. Roads and pavementsComputer memoryCivil and Structural EngineeringProbabilityCable-stayedStaged constructionbusiness.industrycable-stayed; bridge; stay; probability; staged construction; parameter variabilityBuilding and ConstructionStructural engineeringDistribution (mathematics)symbolsCable stayedClosed-form expressionStaybusinessThe Baltic Journal of Road and Bridge Engineering
researchProduct

Stressing sequence of steel cable-stayed bridges built by cantilevering

2015

The construction of cable-stayed bridges by cantilevering implies several changes of geometry, stress and strain patterns during the assemblage of segments. The main target to be satisfied in the construction process is the achievement of the required final geometry and of a convenient state of stress for self-weight and sustained loads. The sequence of stay stressing and the values of prestressing forces at each stage of segment assembling have the main role for reaching the desired result of design, due to the large redundancy of cable-stayed structures.Among the different procedures proposed in the literature for initial cable force determination, the Partial Elastic Scheme (PES) Method …

Finite element methodPrestressingConstruction processStaged constructionFinite element procedurePrestressing forcescable stayed bridgeGeometryCable stayed bridgesNonlinear behavioursSteel cable-stayed bridgesSettore ICAR/09 - Tecnica Delle CostruzioniGeometric non-linearityOffshore pipelinesCable stayed bridges; Finite element method; Geometry; Offshore pipelines; Prestressing; Construction process; Finite element procedure; Geometric non-linearity; Nonlinear behaviours; Prestressing forces; Staged construction; Steel cable-stayed bridges; Stress and strainStress and strain
researchProduct

Creep effects and stress adjustments in cable-stayed bridges with concrete deck

2010

In construction stages of cable-stayed bridges with prestressed concrete deck, the influence of creep on stresses and strains is very important in order to foresee the final patterns of internal forces and displacements. In cantilever construction, the concrete deck can be considered, in each stage, as a continuous beam resting on elastic restraints, which modify with successive additions of new segments, until the last one has been assembled. In these stages stress relaxation in concrete occurs as well as vertical displacements increase. Ehen structure has been closed by inserting midspan segment, stress redistribution begins, due to creep. Deformation and internal force development in con…

bridges creep staged construction
researchProduct